Home › AOV & Smoke Ventilation › AOV Remedial Works After Failed Inspection
We carry out AOV remedial works following failed inspections, surveys and system testing, correcting identified faults and helping restore proper smoke ventilation system operation.
We review failed AOV inspections and identified defects, carry out the required remedial works and retest affected components to confirm correct system operation.
BLEC Group completes corrective AOV work following inspections, surveys or system tests that have highlighted faults requiring attention. Our directly employed engineers assess the reported issues before repairing defective equipment, replacing failed components and resolving problems affecting the smoke ventilation system.
As an IFC SDI 19 certified smoke ventilation contractor, we carry out the necessary rectification work to return affected AOV functions to proper operation. Once completed, the relevant system functions are retested, with any additional concerns clearly recorded and further work recommended if needed.
We carry out AOV remedial works across London, Devon, Cornwall, Bristol, South Wales, Oxfordshire, Hampshire, Hertfordshire, Middlesex and Surrey. For properties outside these locations, contact our team to discuss the identified remedial work and check service availability.
Failed AOV inspections can highlight defects that require corrective work. Here are some common issues our engineers can rectify as part of our remedial service:
Our in-house engineers work from the issues recorded during an AOV inspection or smoke ventilation test, assessing each affected area before fixing defective equipment or fitting suitable replacement components.
After the specified remedial work has been carried out, the relevant AOV functions are checked again for proper response. Should further defects become apparent during the visit, we document the findings and outline any additional corrective work needed.
See why customers choose BLEC for AOV remedial works, with certified engineers, thorough rectification and dependable support after failed inspections.
Our IFC SDI 19 certification demonstrates our competence in smoke ventilation remedial work and AOV repairs.
Our in-house engineers complete AOV remedial work, helping maintain consistent standards across every project.
We address defects identified during AOV inspections, completing the corrective work required for affected components.
We repair defective AOV equipment and replace failed components with suitable parts to help restore correct and reliable system operation.
After completing remedial work, we retest the affected AOV functions to confirm correct response and reliable system operation.
Our engineers have experience rectifying defects across established AOV and smoke ventilation systems.
Explore our wider AOV services, helping keep smoke ventilation systems maintained and operating effectively.
Scheduled servicing to keep your AOV system fully compliant and operational. Annual contracts available.
Reactive and planned maintenance for AOV systems — fault diagnosis, repairs, and full system overhauls.
Pair your AOV with a BS 5839-compliant fire alarm system for full smoke detection & control coverage.
See what customers have to say about our skilled team, dependable service and quality of work across the UK.
Find useful answers about correcting AOV issues highlighted during inspections and system testing. Need advice on the next steps? Contact the BLEC team.
Yes. If you already have an inspection or testing report identifying AOV defects, this can be reviewed to establish the remedial work required. Depending on the findings, further checks may be needed before repairs or component replacements are completed.
Not necessarily. Inspection findings can vary from advisory items to defects that affect the operation of the smoke ventilation system. The required action should be based on the specific defect, its effect on the system and the recommendations recorded during the inspection.
This depends on the defects identified, the building and how the affected equipment contributes to the smoke-control system. Where several items require attention, the work may need to be prioritised according to the inspection findings and any associated fire-safety requirements rather than treating every item identically.
Providing the latest AOV inspection or testing report is a useful starting point. Details of the building, affected equipment, photographs, previous service records and information about the installed AOV system can also help establish the scope before remedial work begins.
Where an existing component is obsolete or no longer suitable, replacement equipment may be required rather than repairing the original unit. The replacement needs to be appropriate for the existing smoke ventilation arrangement and compatible with the relevant system components.
The documentation provided should reflect the work and testing actually undertaken. Records can include completed remedial items and subsequent testing or commissioning information where applicable.